For those readers of this blog who are unfamiliar with the new high school project, here are a few illustrations to help clarify what Mark Gold is talking about in his school project position...
Below is a schematic drawing of the first floor current building configuration showing the various additions including the 1971 wing (pool + library + BTC/open space).
During the review of the current LHS facility, there were positive comments made about the condition of the 1971 wing which were presented at numerous SBC public forums.
- The 1971 wing is structurally in better shape and has a higher potential for minor renovations.
- The roof is in satisfactory condition.
- Pool systems are in good condition.
The first floor of the proposed new high school building structure is shown below including the location of the 1971 wing...
[click to enlarge]
Below is a detailed look at the renovated 1971 wing....[click to enlarge]
Here is a graphic showing the entire site plan for the new HS project.
No comments:
Post a Comment