Below is an excerpt from the full report issued by the Adult Center Building Committee (ACBC) chaired by Marybeth Bergeron regarding the possible selection of Greenwood Park for a renovated or new Adult Center.  This report was presented by Ms. Bergeron to the Select Board at their regular meeting on September 3, 2016.
_______________________________________

There were 8 potential sites investigated by the ACBC which included the following:

Greenwood Park, Turner Park Site #1, Turner Park Site #2. Wolf Swamp Road Fields, Cordis property/ Library site, Academy Drive (water tower property), Laurel Park and Bliss Park

The following criteria were used for all of these proposed sites:

Deed Restrictions, Article 97 Implications, Infrastructure, Impact on Sports Fields, Historic Implications, Conservation, Neighborhood/ Political

Here is the Greenwood Park analysis from the report:

The current Adult Center is located on this site.  The Adult Center occupies approximately 8,000 sf of the building which is an old school.  Also in the same building is the Longmeadow Parks/ Recreation Day Care Center which serves approximately 56 children as well as the after school program for 60 children. The summer camp (80 children) uses the building, along with pickle ball players, the Longmeadow Parks/ Recreation After School Program, Willie Ross School, CYO basketball, Youth basketball, Adult volleyball and karate.

Additionally the Veteran's Representative, public nurse, Town Food Bank, the Federal Meals Program is all located within the Adult Center wing of the Greenwood Center building. The building is often used by sports teams and other groups in the evenings, averaging 2-3 meetings per week.

There are two baseball fields used daily. There is a playground as well as one of the Town's pools.

Approximately 1,000 sf of the Adult Center wing is hallway, and 500-600 sf is for the bathrooms. This building is located in the very south portion of the town, and is not at a central location in our town. The seniors are "tucked away", and for many the drive to the center from the north end of the town is challenging.
  • Deed Restrictions: Unknown, must be researched 
  • Article 97 Implications: Possible - Should the town decide to construct an addition to the west of the existing building wing, Article 97 could apply. Deed research needs to be done, specifically as it relates to the extension into the park. 
  • Infrastructure: Available 
  • Impact on Sports fields: At least one and possibly both ball fields will be lost 
  • Historic Implications: None 
  • Conservation: No identified issues 
  • Neighborhood/Political: We do believe there is a constituency of people in our town who would not wish the Adult Center to move, as they are accustomed to enjoying recreational services at the existing site.  Many seniors have a high resistance to change, and this will be a challenge to overcome.
Conclusions
Although constructing an addition on the existing building which would require renovating the entire building due to code requirements is feasible (see drawing from the Dietz & Company Architects report below), we believe that the 12 to 18 month disruption of the plethora of services to the town residents would be very difficult. The renovations would require that the Federal Meals on Wheels program be turned over to East Longmeadow, the Day Care Center would have to be moved at CONSIDERABLE expense due to the State requirements (furniture bolted to floors, bathrooms in every room, etc.), the Parks/ Recreation After School program for students moved to other locations, programs for the seniors would have to be halted for lack of space at other locations in town, the CYO Youth basketball, pickle ball, Willie Ross School, etc., would be very problematic and a huge disruption for our residents. The loss of at least one ball field would affect residents.

We also believe that the resulting product (state of the art addition of brand new construction, aside a school designed in the late 60's) would not create an attractive exterior. The costs associated with a move/ termination of much needed services to the most frail in Longmeadow, in combination with the construction of the addition, would at LEAST equal the cost of building a new building elsewhere in the town.
_________________________________
Here is some earlier developed information for a proposed Renovation of Greenwood Center described in the Dietz & Company Architects Report- January 15, 2016.

Figure 2- Proposed Renovation of Greenwood Center-
Dietz & Company Architects Report- January 15, 2016
(click to enlarge)

Below is a table from the Dietz & Company report comparing Advantages vs. Disadvantages of renovating Greenwood Park Center.

Table 1- Comparison of Advantages vs. Disadvantages
Dietz & Company Architects Report- January 15, 2016
(click to enlarge)
________________________________
Bottom Line: Demolishing the current Greenwood Park Center and building a new one or renovating the old building at the same site would result in a desirable outcome.  However, all of the disadvantages highlighted above by two different comprehensive studies strongly suggest that the Greenwood Park site is not a desirable site for the new Adult Center.

Here ares link to some additional information on this subject:
  1. Longmeadow Adult Center: Feasibility Study and Design Study
    Dietz and Co. Architects, Inc. January 15, 2016
  2. Update- Longmeadow Adult Center Feasibility Study,
    LongmeadowBuzz blog post by J.R. Moran, January 28, 2016
Jim Moran

No comments: